UNDERESTIMATIONS - перевод на арабский
Diclib.com
Словарь ChatGPT
Введите слово или словосочетание на любом языке 👆
Язык:     

Перевод и анализ слов искусственным интеллектом ChatGPT

На этой странице Вы можете получить подробный анализ слова или словосочетания, произведенный с помощью лучшей на сегодняшний день технологии искусственного интеллекта:

  • как употребляется слово
  • частота употребления
  • используется оно чаще в устной или письменной речи
  • варианты перевода слова
  • примеры употребления (несколько фраз с переводом)
  • этимология

UNDERESTIMATIONS - перевод на арабский

UNEXPECTED INCURRED COSTS IN EXCESS OF BUDGETED AMOUNTS
Underestimate; Cost Overrun; Cost overun; Cost increase; Budget increase; Budget escalation; Cost overruns; Budget overrun; Over budget; Escalating costs; Escalating cost; Cost risk; Cost underestimation; Low balling; Cost increases; Underestimated; Cost under-estimation; Cost underestimations; Cost under-estimations

UNDERESTIMATIONS      

ألاسم

تَهَاوُن

UNDERESTIMATED         

الفعل

أَصْغَرَ ; اِحْتَقَرَ ; اِسْتَحْقَرَ ; اِسْتَخَفَّ بِـ ; اِسْتَصْغَرَ ; اِسْتَقَلَّ ; تَهَاوَنَ ; حَقَرَ ; حَقَّرَ ; صَغَّرَ ; غَضَّ مِنْ ; قَلَّلَ من شَأْنِهِ أو أَهَمِّيَّتِهِ ; وَضَعَ ; وَضَعَ مِنْ

underestimate         
فِعْل : يبْخَسْ التقدير . يستخفّ بـ

Определение

underestimate
v. a.
Undervalue, underrate, misprize, rate below the true value, rate too low.

Википедия

Cost overrun

A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms.

Cost overruns are common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.

Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.

Cost overrun is distinguished from cost escalation, which is an anticipated growth in a budgeted cost due to factors such as inflation.

Примеры употребления для UNDERESTIMATIONS
1. She added: "It may be that people are even more unwilling than they have been in the past to tell us how much they drink so we have got more of an underreporting problem." Actual consumption may be higher than the report suggests because of under–reporting by those questioned, fewer young people taking part in the ONS study, and previous underestimations of alcohol in wine, she said.